{"id":153,"date":"2026-07-21T15:39:42","date_gmt":"2026-07-21T15:39:42","guid":{"rendered":"https:\/\/www.ifieldsmart.ai\/blogs\/?p=153"},"modified":"2026-07-21T15:47:59","modified_gmt":"2026-07-21T15:47:59","slug":"top-constructability-issues-in-preconstruction","status":"publish","type":"post","link":"https:\/\/www.ifieldsmart.ai\/blogs\/top-constructability-issues-in-preconstruction\/","title":{"rendered":"Top Constructability Issues Found During Preconstruction Reviews"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Constructability reviews identify design and coordination difficulties before construction, hence eliminating costly field alterations and schedule delays. Project teams often feel confused when they cannot find the right versions, and workers rush through the important checks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When project teams work from different locations or with outdated drawing sets, critical constructability issues can be overlooked. An effective <a href=\"https:\/\/www.ifieldsmart.ai\/skills\/constructability-review\/\" target=\"_blank\" rel=\"noreferrer noopener\">constructability review<\/a> process helps teams resolve design conflicts before they affect procurement, scheduling, or field operations. With a detailed design constructability review, architects, engineers, and contractors can identify coordination gaps early and improve the overall construction plan review process.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Coordinating information across multiple disciplines requires careful review to ensure every system fits together as intended. Plus, time slips away very fast, and cash overruns happen when mistakes are made.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Checking Designs Before Building Starts<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A thorough constructability review helps identify design conflicts and coordination issues before construction begins. When project teams work from different locations or with outdated drawing sets, critical design issues can be overlooked.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Early reviews help teams to resolve design conflicts before they affect procurement, scheduling, or field operations. Drawings can easily clash with each other, and equipment might not fit in the tight space. Teams might follow the wrong design versions, which turn small gaps into big delays.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Architects and builders look at the plan together so everyone can check the exact same information. The primary objective is to identify constructability issues before construction begins. Find major problems very early for fixes to stay within budget.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Modern constructability reviews combine drawings, BIM models, specifications, and project documentation to provide a comprehensive understanding of the design. The <a href=\"https:\/\/www.ifieldsmart.ai\" target=\"_blank\" rel=\"noreferrer noopener\">iFieldSmart AI<\/a> platform checks these files too, and it extracts notes right away using smart tech.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Good reviews spot design clashes early, and they check work across every trade while planning better site steps. They stop extra requests and poor work to keep cash and time under control.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A hospital project reached the check stage, and people checked the medical gas lines. The pipes hit the structural beams, but designers fixed the route before building. Setup stayed right on time, and nobody did the work twice.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Perform the constructability review correctly.<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A good review needs clear steps because random checks miss too many things. A smart workflow keeps teams focused, and a normal check looks like this.<\/p>\n\n\n<h2>Constructability Review Workflow<\/h2>\n\n  <ul>\n    <li>Collect project drawings, BIM models, specifications, and contract documents.<\/li>\n    <li>Review various designs for coordination and constructability issues.<\/li>\n    <li>Identify clashes, access constraints, sequencing challenges, and code compliance concerns.<\/li>\n    <li>Document findings and assign corrective actions to the appropriate teams.<\/li>\n    <li>Verify updated designs before construction activities begin.<\/li>\n  <\/ul>\n\n\n<p class=\"wp-block-paragraph\">Problems pop up when systems meet, so wood frames and pipes compete. Electrical lines need the same exact space, and early checks find these major conflicts.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Finding physical clashes is highly valuable because combined models show real hits while plain drawings miss deep hits. Reviewers also check the ceiling space, and they verify room for maintenance access.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">AI tools compare rules against project standards so they catch clearance issues early. Physical hits only tell part of the story since bad notes or missed sizes cause nasty delays.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Conflicting specs stop the whole job, and these gaps lead to field changes. Scope gaps cause another challenge when packages give tasks to the wrong trades.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sometimes tasks stay fully undefined, but checking papers together spots these issues. The iFieldSmart AI flags missing jobs fast, and it finds mixed notes in less time.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Site logistics need careful attention since crane spots and paths matter heavily. Storage spots affect every build phase, and a design needs room for parts. Workers need space to move safely to check and prevent delays.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An office job reached the final checks, but new drawings had different ceiling heights. The machine model used old versions, so a model check caught the bad match.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Designers fixed the model fast, and this saved the total schedule. Reviews work best with shared info. Updated plans bring clear talks, and this drops doubt before building starts.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Real World Use Case: Airport Terminal Coordination<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A large airport terminal project reached the final design phase. The project involved hundreds of complex files, and different trades worked in totally separate models. This environment made it hard to spot conflicts early, but a structured review caught a massive problem before construction began.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">The Conflict Discovery<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The review process identified a critical coordination gap that traditional methods overlooked:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Huge HVAC ducts directly through the path of the main baggage belts.<\/li>\n\n\n\n<li>Traditional 2D drawings does not reveal the coordination conflict between the systems.<\/li>\n\n\n\n<li>A 3D model check visualized the direct hit, making the physical conflict obvious to all stakeholders.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">The Resolution Process<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Identifying the clashes, the team initiated a rapid resolution workflow:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Engineers moved the duct routing immediately based on the 3D clash data.<\/li>\n\n\n\n<li>The review also spotted missing ceiling clearances in that same exact spot for duct adjustments.<\/li>\n\n\n\n<li>Fixing these complex issues on screen took just two hours of collaborative work.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">The Project Outcome<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The decision to run a structured constructability review provided clear, measurable benefits:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The review identified 46 HVAC-to-baggage conflicts before construction, avoiding approximately three weeks of field rework.<\/li>\n\n\n\n<li>The budget remained completely safe by avoiding expensive field rework and emergency design changes.<\/li>\n\n\n\n<li>The coordinated design allowed the airport project to proceed with confidence.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Beat The Big Review Hurdles<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Even great reviews face tough times owing to the fact that large jobs have thousands of files. Reviewing thousands of project documents while managing frequent design revisions can make constructability reviews time-consuming and challenging.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Design changes bring another big test because every change affects many different trades. One bad beam alters the walls, and missing one fix causes huge issues.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Digital review platforms streamline document analysis by organizing project information and automatically identifying design changes. Tools compare changes very fast, and using OCR technology, they extract callouts and referenced details.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Reviewers spend less time searching folders, and they spend more time solving things. The AI flags risk descriptions clearly, and it shows potential impacts like schedule delays.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Meetings make the review quality better, given that builders and engineers talk about problems. They assign tasks to fix things, and they check the design updates together. This cuts down on confusion so everyone moves in the same direction.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A mixed job had different trade packs, and during a check, structural changes had been missed in the plumbing model. The building stayed right on track.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Good reviews keep simple habits. Teams read the latest project papers, and they check every approved design change. They match drawings with the specs, and they track every issue to the end. They verify models before building begins.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Enhance the Constructability Review Process<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A solid process brings better results due to the fact that occasional checks just fail too much. Every review needs the same flow.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The first step mixes every model; therefore, architects and builders view one model. They verify systems fit the design, and early talks reduce major conflicts.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The next step compares supporting docs since drawings and specs must match perfectly. Any bad match needs fast attention.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">iFieldSmart AI compares info across many files, and the system checks notes and schedules. It spots missing details and gaps, and it finds revision conflicts really well.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The output gives structured findings instantly, and these insights help reviewers focus better. By reducing the time spent locating project information, reviewers can focus on evaluating constructability risks and making informed decisions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Checks must happen during all phases; as a result, every big update needs another check. Reviewers confirm old issues stay fixed, and they ensure new changes work well.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Old Way vs AI-Assisted Way<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Traditional Review<\/th><th>AI-Assisted Review<\/th><\/tr><\/thead><tbody><tr><td>Review drawings individually<\/td><td>Analyze drawings and specifications together<\/td><\/tr><tr><td>Perform manual document checks<\/td><td>Automate document comparison<\/td><\/tr><tr><td>Conduct lengthy coordination meetings<\/td><td>Identify issues earlier with AI-assisted analysis<\/td><\/tr><tr><td>Detect clashes during coordination meetings<\/td><td>Highlight conflicts before coordination meetings<\/td><\/tr><tr><td>Track revisions manually<\/td><td>Automatically monitor drawing revisions<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Improve Construction Risk Management<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">These reviews lower many risks, and they reduce financial and safety risks. Safety goes up with careful checks because of lifting steps and access reviews. Many hazards vanish before crews arrive.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cost control gets much better too, since early talks stop wasted raw materials. They avoid expensive field changes, and fewer conflicts mean better budget safety.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Early constructability planning optimizes structural designs, reducing material waste and minimizing costly modifications during construction. AI checks help spot missing panels, and they ensure maintenance access stays clear. Schedules become much easier to run because good drawings reduce extra questions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Construction progresses more efficiently with fewer interruptions caused by design conflicts or missing information. Reviews confirm all papers match up, and clear papers help trades work well.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An industrial plant needed massive machine tools, and the tools had to fit inside safely. The review spotted very tight access points, and the team changed the overall order of work. This avoided breaking walls down later, and it saved weeks of major delays.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The Future Of Constructability Reviews<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The future looks promising for construction crews since design data will stay active all day long. As digital workflows evolve, AI will increasingly support continuous document monitoring and faster identification of design changes. The system checks drawings against project rules constantly, and conflicts pop up right on the screen. Teams stop checking files in big batches since errors are the second they start.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This shifts how everyone works together, and predictive tools flag risks before they happen. They spot clashes from past job history, while builders stop hunting for bugs in big files. Better integration between design and field teams can improve collaboration throughout the project lifecycle. Continuous design validation can provide teams with greater confidence before construction begins. It feels a lot more certain during design and construction now.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">FAQ&#8217;s<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>How do reviews stop clash issues?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">AI constructability review compares architectural, structural, and MEP designs, identifying clashes before construction begins by reducing rework and improving coordination.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Does this help with trade coordination?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Yes. Constructability reviews bring together information from multiple disciplines, helping architects, engineers, and contractors identify coordination issues and work from the latest project information.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>How does AI compare specs and drawings?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The AI analyzes project documents to identify missing information and potential compliance issues.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Does AI speed up the review cycle?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">AI accelerates document reviews by analyzing large drawing sets, specifications, and revisions in minutes rather than through manual reviews, allowing engineers to focus on resolving critical issues.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>How does AI verify updated drawings?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">AI compares revised drawing sets with previous versions, highlighting changes in layouts, annotations, and notes so reviewers can quickly assess their impact.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>How do constructability reviews reduce project risk?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It identifies design conflicts, coordination issues, and challenges before construction begins. Resolving issues during preconstruction helps reduce rework, improve reliability, and control project costs.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Conclusion<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The constructability review process bridges the gap between design and actual construction requirements. Smart tools make this much better since models give clear views to everyone. <a href=\"https:\/\/www.ifieldsmart.ai\/skills\/\" target=\"_blank\" rel=\"noreferrer noopener\">iFieldSmart AI<\/a> helps spot gaps very fast, and it reads notes and catches errors using OCR technology.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Structured reports show exact issue spots. While engineers remain responsible for technical decisions, AI helps automate repetitive document reviews and highlights issues that require further evaluation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Strong planning pays off every time, as early talks reduce rework. They improve safety and save cash, so jobs move with very few surprises. A good review gives strong starts, and it builds a smoother path forward.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Constructability reviews identify design and coordination difficulties before construction, hence eliminating costly field alterations and schedule delays. Project teams often feel confused when they cannot find the right versions, and&#8230;<\/p>\n","protected":false},"author":1,"featured_media":154,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"class_list":["post-153","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-preconstruction","blog-card"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Top Constructability Issues in Preconstruction | Blogs<\/title>\n<meta name=\"description\" content=\"Discover how to identify and resolve top constructability issues during preconstruction reviews to prevent costly construction delays and budget overruns.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ifieldsmart.ai\/blogs\/top-constructability-issues-in-preconstruction\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Top Constructability Issues in Preconstruction | Blogs\" \/>\n<meta property=\"og:description\" content=\"Discover how to identify and resolve top constructability issues during preconstruction reviews to prevent costly construction delays and budget overruns.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ifieldsmart.ai\/blogs\/top-constructability-issues-in-preconstruction\/\" \/>\n<meta property=\"og:site_name\" content=\"iFieldSmart Ai Blog\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-21T15:39:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-21T15:47:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.ifieldsmart.ai\/blogs\/wp-content\/uploads\/2026\/07\/Blog-Banner-5.png\" \/>\n\t<meta property=\"og:image:width\" content=\"790\" \/>\n\t<meta property=\"og:image:height\" content=\"444\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.ifieldsmart.ai\/blogs\/top-constructability-issues-in-preconstruction\/\",\"url\":\"https:\/\/www.ifieldsmart.ai\/blogs\/top-constructability-issues-in-preconstruction\/\",\"name\":\"Top Constructability Issues in Preconstruction | Blogs\",\"isPartOf\":{\"@id\":\"https:\/\/www.ifieldsmart.ai\/blogs\/#website\"},\"datePublished\":\"2026-07-21T15:39:42+00:00\",\"dateModified\":\"2026-07-21T15:47:59+00:00\",\"author\":{\"@id\":\"https:\/\/www.ifieldsmart.ai\/blogs\/#\/schema\/person\/1b1b50ea7b2028b79fc793da114228bc\"},\"description\":\"Discover how to identify and resolve top constructability issues during preconstruction reviews to prevent costly construction delays and budget overruns.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.ifieldsmart.ai\/blogs\/top-constructability-issues-in-preconstruction\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.ifieldsmart.ai\/blogs\/top-constructability-issues-in-preconstruction\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.ifieldsmart.ai\/blogs\/top-constructability-issues-in-preconstruction\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.ifieldsmart.ai\/blogs\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Top Constructability Issues Found During Preconstruction Reviews\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.ifieldsmart.ai\/blogs\/#website\",\"url\":\"https:\/\/www.ifieldsmart.ai\/blogs\/\",\"name\":\"iFieldSmart Ai Blog\",\"description\":\"Just another WordPress site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.ifieldsmart.ai\/blogs\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Top Constructability Issues in Preconstruction | Blogs","description":"Discover how to identify and resolve top constructability issues during preconstruction reviews to prevent costly construction delays and budget overruns.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ifieldsmart.ai\/blogs\/top-constructability-issues-in-preconstruction\/","og_locale":"en_US","og_type":"article","og_title":"Top Constructability Issues in Preconstruction | Blogs","og_description":"Discover how to identify and resolve top constructability issues during preconstruction reviews to prevent costly construction delays and budget overruns.","og_url":"https:\/\/www.ifieldsmart.ai\/blogs\/top-constructability-issues-in-preconstruction\/","og_site_name":"iFieldSmart Ai Blog","article_published_time":"2026-07-21T15:39:42+00:00","article_modified_time":"2026-07-21T15:47:59+00:00","og_image":[{"width":790,"height":444,"url":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-content\/uploads\/2026\/07\/Blog-Banner-5.png","type":"image\/png"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.ifieldsmart.ai\/blogs\/top-constructability-issues-in-preconstruction\/","url":"https:\/\/www.ifieldsmart.ai\/blogs\/top-constructability-issues-in-preconstruction\/","name":"Top Constructability Issues in Preconstruction | Blogs","isPartOf":{"@id":"https:\/\/www.ifieldsmart.ai\/blogs\/#website"},"datePublished":"2026-07-21T15:39:42+00:00","dateModified":"2026-07-21T15:47:59+00:00","author":{"@id":"https:\/\/www.ifieldsmart.ai\/blogs\/#\/schema\/person\/1b1b50ea7b2028b79fc793da114228bc"},"description":"Discover how to identify and resolve top constructability issues during preconstruction reviews to prevent costly construction delays and budget overruns.","breadcrumb":{"@id":"https:\/\/www.ifieldsmart.ai\/blogs\/top-constructability-issues-in-preconstruction\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ifieldsmart.ai\/blogs\/top-constructability-issues-in-preconstruction\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.ifieldsmart.ai\/blogs\/top-constructability-issues-in-preconstruction\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ifieldsmart.ai\/blogs\/"},{"@type":"ListItem","position":2,"name":"Top Constructability Issues Found During Preconstruction Reviews"}]},{"@type":"WebSite","@id":"https:\/\/www.ifieldsmart.ai\/blogs\/#website","url":"https:\/\/www.ifieldsmart.ai\/blogs\/","name":"iFieldSmart Ai Blog","description":"Just another WordPress site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ifieldsmart.ai\/blogs\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/posts\/153","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/comments?post=153"}],"version-history":[{"count":2,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/posts\/153\/revisions"}],"predecessor-version":[{"id":156,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/posts\/153\/revisions\/156"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/media\/154"}],"wp:attachment":[{"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/media?parent=153"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/categories?post=153"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/tags?post=153"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}