{"id":175,"date":"2026-08-03T16:56:10","date_gmt":"2026-08-03T16:56:10","guid":{"rendered":"https:\/\/www.ifieldsmart.ai\/blogs\/?p=175"},"modified":"2026-08-03T16:56:12","modified_gmt":"2026-08-03T16:56:12","slug":"construction-specification-review-checklist","status":"publish","type":"post","link":"https:\/\/www.ifieldsmart.ai\/blogs\/construction-specification-review-checklist\/","title":{"rendered":"Construction Specification Review Checklist for Project Teams"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Building a commercial property or major infrastructure asset requires managing immense volumes of highly intricate design data. Project documents outline definitive boundaries for materials, dimensional limits, and specific installation rules, yet notable gaps between design intent and actual field materials frequently occur.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Field engineering teams often face significant challenges when manually verifying thousands of design pages against incoming material <a href=\"https:\/\/www.ifieldsmart.ai\/skills\/submittal-log-generator\/\" target=\"_blank\" rel=\"noreferrer noopener\">submittals<\/a>. Establishing a standardized review process ensures that every field material matches the contract paperwork perfectly, and this guide outlines exactly how teams can build an error-free validation process using a modern review framework.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Perform a construction specification review to eliminate documentation gaps.<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The critical initial step in managing overall project risk is to analyze deep-dive binders before procurement begins. Project teams must read every line of the engineering guidelines before materials arrive to confirm that the field staff completely understands all test requirements, thickness rules, and code references. Missing a single sentence about material testing can stop field installations later and cause cascading schedule delays. A standard manual check requires a reviewer to read these heavy guidelines line by line to mark every required material document, product sample, and independent proof certificate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A thorough review builds a strong foundation for the entire quality assurance plan across the lifecycle of the development. The team carefully lists every technical standard, like ASTM or SMACNA, mentioned in the engineering text, and this detailed list becomes the master guide for the project quality team. This ensures that the engineering staff knows exactly what documents to demand from suppliers, and checking these fine details early stops incorrect orders before manufacturing even begins at the factory.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Teams often face massive piles of complex paperwork distributed across entirely different engineering fields, like structural and civil systems. Mechanical, electrical, and plumbing sections have unique rules that require separate checks, making it easy to miss a small requirement when jumping between large binders. A structured checklist keeps the team focused on critical engineering aspects like pressure limits and fire ratings.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Verify construction submittals with rigorous checklist protocols.<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Managing incoming material documents requires a strict verification workflow to maintain high standards of site safety. Subcontractors send product sheets, shop data, and official test results for approval before ordering any components. The review team must check these electronic files against the contract layout papers to confirm that the proposed items fit the exact physical space and meet structural needs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A typical verification checklist contains several critical checkpoints:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Verify material grades and thickness against structural plans.<\/li>\n\n\n\n<li>Confirm testing certifications match regional building codes.<\/li>\n\n\n\n<li>Check dimensional limits to ensure proper physical fit.<\/li>\n\n\n\n<li>Review installation manuals for specific field conditions.<\/li>\n\n\n\n<li>Validate manufacturer warranty terms against contract guidelines.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Reviewers must look far beyond basic product names during this process to verify specific performance numbers like acoustic limits or electrical loads. A simple oversight during text verification can lead to structural failures or severe building code violations down the line. If an incoming document lacks necessary data, the team must reject it immediately because strict control keeps the job site safe and keeps the budget on track.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Managing paper logs manually often slows down these verification steps as field delivery dates get closer. Documents sit on desks waiting for signatures while field operations stall, creating an urgent need for a clearer way to process documents.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Automate Your Specification Review Workflow<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Integrating smart software alters how project engineers manage their daily tracking protocols during intensive review cycles. Traditional paper lists rely heavily on manual human memory to catch omissions across large document piles, which naturally introduces variance. Smart systems cross-reference engineering text files directly with active item tallies to populate checks automatically, and this automation ensures that no single testing requirement or material grade drops off the master safety sheet.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dynamic digital trackers adapt instantly when architects issue revised design sheets midway through a project. The software updates active material tallies across all engineering fields simultaneously to reflect new parameters, which keeps quality control staff perfectly aligned with fresh performance standards without requiring manual updates. Teams can instantly view which line items require immediate subcontractor action.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Automated checklist systems reduce human oversight by establishing clear digital trails for every single material parameter. Reviewers can trace specific approvals back to individual engineering clauses within the master project handbook, and this level of organization gives project teams total clarity during large-scale site inspections.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Improve Specification Reviews with AI<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Deploying artificial intelligence transforms how project teams build and execute their quality control tracking lists on complex jobs. Instead of engineers spending days scanning large specification bibles to find isolated rules, the smart models read text files in seconds to isolate every specific testing criterion, standard number, and execution step instantly. It populates the review tracker automatically without missing hidden data points that humans might easily skim over.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Smart checklists use pattern matching to link specific subcontractor documents with their corresponding contract clauses. If a spec requires a particular sheet thickness, the model marks that checkbox on the master engineering list and alerts teams when data sheets contain conflicting numbers compared to the contract plans. This automation removes standard human tracking errors completely from the workflow.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The digital system logs every validation step to build a transparent quality history for inspections and audits. It matches real-time file incoming flows with open list requirements automatically, which keeps project managers aware of critical items that need immediate attention before field crews begin pouring or framing.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Implement automated submittal review for faster project cycles.<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Moving from manual checking to modern technology changes how teams handle data across all active project phases. An <a href=\"https:\/\/www.ifieldsmart.ai\/skills\/submittal-compliance-review\/\" target=\"_blank\" rel=\"noreferrer noopener\">automated submittal review<\/a> system reads incoming documents instantly, using smart algorithms to extract product numbers, test codes, and material descriptions from long PDF files. It attributes this information to contract rules to show inconsistencies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">AI-based document review tools like iFieldSmart AI allow users to compare specification requirements to the submitted documents automatically. This helps users to locate what&#8217;s missing, along with compliance issues, if any, even before approvals are granted.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The technology fits into existing logging workflows without changing project steps or disrupting established team habits. It connects with common project tracking systems to pull files automatically, and this connection keeps records clean and updated across the entire project team.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Verify Compliance Before Installation<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The final validation step happens during a comprehensive quality assessment performed before site installation. This process cross-references the approved material data with actual field conditions to ensure that local building codes and industry standards match the material choices. A complete assessment looks at specifications, contract drawings, trade standards, and regional laws simultaneously.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A weak assessment process can lead to serious field issues:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Rework costs occur when installing unverified materials.<\/li>\n\n\n\n<li>Project schedules slip during lengthy documentation arguments.<\/li>\n\n\n\n<li>Costly change orders arise from overlooked material differences.<\/li>\n\n\n\n<li>Legal liabilities due to violation of legal codes.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Catching an error on paper costs nothing compared to fixing a field mistake after installation. If a team finds a mistake after installation, they must tear down the work, which causes major delays and hurts the project budget. A strict compliance process ensures item verification before installation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Qualified project managers always make the final approval call based on verified reports. The technology serves as a powerful assistant that organizes the data and maintains full accountability for the final site decisions. Also, this balance ensures high-quality control throughout the construction process.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Real-world scenario of specification review in action<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A midrise office project in the US faced a tight schedule for its mechanical installations. The mechanical subcontractor submitted an extensive piping package covering water systems, and the submittal package contained over three hundred pages of product sheets and material test reports. The project engineer needed to verify this package against Division 22 rules quickly to avoid stalling the site crews.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project engineer utilized iFieldSmart AI to accelerate the analysis process and save hours of manual checking. The system scanned the entire piping document against the master project specifications in minutes and quickly identified that the subcontractor provided Schedule 40 PVC pipe sheets as required; however, it detected a major gap in the documentation package.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The system flagged the submittal as a partial compliance risk because the subcontractor had omitted the specific pressure rating sheet for the pipes at high temperatures. It also noted that the solvent cement data sheet did not mention the required ASTM D2564 standard.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The report provided a clear breakdown of these missing items instantly, which allowed the project engineer to use this data to issue a precise resubmission request. The subcontractor received exact notes about what to fix within the hour, and this quick action stopped non-compliant pipes, avoiding potential field leaks and costly rework.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Frequently asked questions about specification reviews.<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What is a construction specification review?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It is a comprehensive process where project teams carefully check contract binders to understand all material rules and testing demands before building begins.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Why are construction submittals critical for field teams?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These documents prove that the materials a subcontractor wants to buy match the architectural design plans and structural safety codes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>How does automated submittal review save engineering time?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The technology reads long files instantly to find material data, which reduces manual cross-referencing work from hours down to minutes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What does a construction compliance review include?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It checks submittals against four main areas, including specifications, drawings, trade standards, and local laws.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Can iFieldSmart AI connect with existing project systems?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Yes, the system links with existing logs like Procore to pull and check files without changing your current workflow steps.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What do partial compliance labels mean in a report?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This label means the main product matches the requirements, but some important paperwork like a test certificate or warranty sheet is missing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Who makes the final decision when using automated systems?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project engineer or project manager always makes the final call because accountability stays with the person rather than the technology.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>What field risks happen when documentation checks are weak?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Teams face expensive rework, project delays, unexpected change orders, and building code violations on the active job site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>When should a project team perform these material reviews?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Teams must complete these checks during preconstruction or early construction phases before anyone orders or ships materials to the site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>How do automated reports show document errors?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The reports give a clear breakdown of requirements versus actual submissions, along with clear steps for corrections.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Conclusion<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Successful specification reviews consist of detailed checklists and submittal review. These processes also incorporate compliance checks. If reviewed as recommended, the majority of required documentation gaps are captured before procurement and installation to minimize rework and improve quality. Further, redundant work is eliminated. Advances in <a href=\"https:\/\/www.ifieldsmart.ai\/\" target=\"_blank\" rel=\"noreferrer noopener\">AI<\/a> technology have increased capabilities for document processing and review. Document review tools are not meant to remove the human element of engineering. They are meant to support the engineering process and increase speed.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Building a commercial property or major infrastructure asset requires managing immense volumes of highly intricate design data. Project documents outline definitive boundaries for materials, dimensional limits, and specific installation rules,&#8230;<\/p>\n","protected":false},"author":1,"featured_media":176,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10],"tags":[],"class_list":["post-175","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-submittal-management","blog-card"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Construction Specification Review Checklist | Blogs<\/title>\n<meta name=\"description\" content=\"Streamline your construction specification review. Learn how to use automated checklists and AI tools to eliminate project documentation gaps and rework.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ifieldsmart.ai\/blogs\/construction-specification-review-checklist\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Specification Review Checklist | Blogs\" \/>\n<meta property=\"og:description\" content=\"Streamline your construction specification review. Learn how to use automated checklists and AI tools to eliminate project documentation gaps and rework.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ifieldsmart.ai\/blogs\/construction-specification-review-checklist\/\" \/>\n<meta property=\"og:site_name\" content=\"iFieldSmart Ai Blog\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-03T16:56:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-03T16:56:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.ifieldsmart.ai\/blogs\/wp-content\/uploads\/2026\/08\/Blog-Blog.png\" \/>\n\t<meta property=\"og:image:width\" content=\"790\" \/>\n\t<meta property=\"og:image:height\" content=\"444\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.ifieldsmart.ai\/blogs\/construction-specification-review-checklist\/\",\"url\":\"https:\/\/www.ifieldsmart.ai\/blogs\/construction-specification-review-checklist\/\",\"name\":\"Construction Specification Review Checklist | Blogs\",\"isPartOf\":{\"@id\":\"https:\/\/www.ifieldsmart.ai\/blogs\/#website\"},\"datePublished\":\"2026-08-03T16:56:10+00:00\",\"dateModified\":\"2026-08-03T16:56:12+00:00\",\"author\":{\"@id\":\"https:\/\/www.ifieldsmart.ai\/blogs\/#\/schema\/person\/1b1b50ea7b2028b79fc793da114228bc\"},\"description\":\"Streamline your construction specification review. Learn how to use automated checklists and AI tools to eliminate project documentation gaps and rework.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.ifieldsmart.ai\/blogs\/construction-specification-review-checklist\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.ifieldsmart.ai\/blogs\/construction-specification-review-checklist\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.ifieldsmart.ai\/blogs\/construction-specification-review-checklist\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.ifieldsmart.ai\/blogs\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction Specification Review Checklist for Project Teams\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.ifieldsmart.ai\/blogs\/#website\",\"url\":\"https:\/\/www.ifieldsmart.ai\/blogs\/\",\"name\":\"iFieldSmart Ai Blog\",\"description\":\"Just another WordPress site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.ifieldsmart.ai\/blogs\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Specification Review Checklist | Blogs","description":"Streamline your construction specification review. Learn how to use automated checklists and AI tools to eliminate project documentation gaps and rework.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ifieldsmart.ai\/blogs\/construction-specification-review-checklist\/","og_locale":"en_US","og_type":"article","og_title":"Construction Specification Review Checklist | Blogs","og_description":"Streamline your construction specification review. Learn how to use automated checklists and AI tools to eliminate project documentation gaps and rework.","og_url":"https:\/\/www.ifieldsmart.ai\/blogs\/construction-specification-review-checklist\/","og_site_name":"iFieldSmart Ai Blog","article_published_time":"2026-08-03T16:56:10+00:00","article_modified_time":"2026-08-03T16:56:12+00:00","og_image":[{"width":790,"height":444,"url":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-content\/uploads\/2026\/08\/Blog-Blog.png","type":"image\/png"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.ifieldsmart.ai\/blogs\/construction-specification-review-checklist\/","url":"https:\/\/www.ifieldsmart.ai\/blogs\/construction-specification-review-checklist\/","name":"Construction Specification Review Checklist | Blogs","isPartOf":{"@id":"https:\/\/www.ifieldsmart.ai\/blogs\/#website"},"datePublished":"2026-08-03T16:56:10+00:00","dateModified":"2026-08-03T16:56:12+00:00","author":{"@id":"https:\/\/www.ifieldsmart.ai\/blogs\/#\/schema\/person\/1b1b50ea7b2028b79fc793da114228bc"},"description":"Streamline your construction specification review. Learn how to use automated checklists and AI tools to eliminate project documentation gaps and rework.","breadcrumb":{"@id":"https:\/\/www.ifieldsmart.ai\/blogs\/construction-specification-review-checklist\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ifieldsmart.ai\/blogs\/construction-specification-review-checklist\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.ifieldsmart.ai\/blogs\/construction-specification-review-checklist\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ifieldsmart.ai\/blogs\/"},{"@type":"ListItem","position":2,"name":"Construction Specification Review Checklist for Project Teams"}]},{"@type":"WebSite","@id":"https:\/\/www.ifieldsmart.ai\/blogs\/#website","url":"https:\/\/www.ifieldsmart.ai\/blogs\/","name":"iFieldSmart Ai Blog","description":"Just another WordPress site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ifieldsmart.ai\/blogs\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/posts\/175","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/comments?post=175"}],"version-history":[{"count":1,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/posts\/175\/revisions"}],"predecessor-version":[{"id":177,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/posts\/175\/revisions\/177"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/media\/176"}],"wp:attachment":[{"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/media?parent=175"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/categories?post=175"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/tags?post=175"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}