{"id":185,"date":"2026-08-10T18:17:49","date_gmt":"2026-08-10T18:17:49","guid":{"rendered":"https:\/\/www.ifieldsmart.ai\/blogs\/?p=185"},"modified":"2026-08-10T18:17:51","modified_gmt":"2026-08-10T18:17:51","slug":"construction-bid-review-checklist","status":"publish","type":"post","link":"https:\/\/www.ifieldsmart.ai\/blogs\/construction-bid-review-checklist\/","title":{"rendered":"Construction Bid Review Checklist: What Contractors Should Validate Before Submission"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Many construction projects face major cost issues early on when teams fail to catch minor errors in the initial planning documents. Contractors must thoroughly review all project files before bidding, as fragmented details often lead to hidden errors that can disrupt the entire budget. Missing just one critical detail during a construction bid review or <a href=\"https:\/\/www.ifieldsmart.ai\/skills\/scope-gap-analysis\/\" target=\"_blank\" rel=\"noreferrer noopener\">scope gap analysis<\/a> can impact the entire project budget. Staff must examine every single page carefully to ensure no hidden costs remain unnoticed. Manual document reviews take up too much time.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Estimators frequently get tired during long file checks, allowing critical details to slip past the human eye. Project files contain scattered data, and plans change quickly during the frantic bidding phase, making it hard for estimators to track every small note. Missing an item can lead to major disputes later on, and companies naturally want to avoid costly field arguments that ruin client relationships. A thorough construction document review keeps a team fully aligned from day one, building a solid foundation for a successful project outcome. Reviewing the best strategy helps handle this document challenge effectively.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How Construction Bid Review Helps Identify Risks Before Submission<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A good bid review process protects project profit by eliminating the uncertainties hidden inside dense documentation packets. Estimators need to check drawings and specification manuals, paying close attention to the general notes printed on every page. Checking the addenda for sudden changes is vital, since these late design adjustments hide many serious project risks. Multiple trades often read the same text differently, and these unclear details lead to major budget problems during installation. Teams must find these issues early on before submitting the final paperwork to the client.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The review workflow starts with project files, meaning teams should gather all architectural plans and structural documents right away. Collecting the mechanical, electrical, and plumbing sheets protects the estimate, and the heating plan details often contain overlapping requirements. The iFieldSmart AI platform reads all these files simultaneously, extracting text from large drawing sets quickly to save hours of manual labor. Estimators can view every reference in one convenient place, making the review much faster for everyone involved.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Consider the steps in a standard review workflow:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Gather all bid documents and drawing sets from the project portal.<\/li>\n\n\n\n<li>Upload the PDF files to the platform for processing.<\/li>\n\n\n\n<li>Let the system scan the text automatically to find discrepancies.<\/li>\n\n\n\n<li>Check the organized notes for missing details or hidden obligations.<\/li>\n\n\n\n<li>Review trade references across all sheets to verify connectivity.<\/li>\n\n\n\n<li>Share the flagged issues with project estimators immediately.<\/li>\n\n\n\n<li>Update final numbers before bid submission to maintain accurate pricing.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Estimators face heavy pressure during the bidding phase due to tight deadlines and massive workloads. Personnel must read hundreds of pages very quickly, even though important details often sit in obscure text blocks at the bottom of sheets. A tiny note can require expensive equipment installation, costing companies significant money when overlooked. The software helps teams avoid these costly oversights, bringing total clarity to the bidding process when time is short.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Preconstruction teams use this workflow to stay organized throughout the chaotic initial phase of a project. Workers no longer flip through paper sheets manually, as the automated system finds coordination risks in seconds. It allows firms to build stronger bids with real data backing up their numbers. Contractors can submit a proposal with total peace of mind, knowing that every line item matches the actual project requirements perfectly.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Stop Profit Loss By Mastering Scope Gap Analysis<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Firms must perform a scope gap analysis right away to ensure no responsibilities drop through the cracks during the handoff between design and construction. This step finds missing responsibilities in project files where tasks are unassigned. Sometimes a task has no assigned owner, or other times two different trades claim the exact same work.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Overlapping trade scope causes confusion and heavy delays on the job site when workers refuse to proceed. The iFieldSmart AI system highlights these conflicts automatically, checking text for inconsistent notes that might confuse subcontractors. Management gets clear visibility before signing anything, preventing legal headaches down the road.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">A Case Study To Understand Construction Bid Review<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Reviewing a real-life example shows how this works in a daily construction environment. Imagine an estimator reviewing a large commercial project plan under a very tight deadline. The architectural sheet mentions a partition wall note, but the structural sheet shows a different wall detail entirely. The estimator might miss this small conflict since the drawings look identical at first glance. The software scans both pages right away and flags the missing partition note immediately, helping the team avoid a bad budget surprise.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Subcontractors also benefit from this smart analysis to understand exact trade tasks before purchasing materials. The system organizes fragmented data into clear lists, allowing teams to see duties without guesswork or estimation errors. This step improves readability for estimation teams, reducing coordination risks before construction work starts on site. Everyone knows exactly what to buy, keeping the material procurement process moving forward smoothly.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Here is a typical scope gap analysis workflow:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Scan drawings for unassigned project responsibilities across all disciplines.<\/li>\n\n\n\n<li>Identify trade overlaps between different contractor teams to avoid double billing.<\/li>\n\n\n\n<li>Highlight inconsistent notes across the drawing sheets before finalizing numbers.<\/li>\n\n\n\n<li>Uncover unclear ownership between various design disciplines during the review.<\/li>\n\n\n\n<li>Generate a structured file of the findings for the project team.<\/li>\n\n\n\n<li>Review the conflicts with project leaders to establish a solution.<\/li>\n\n\n\n<li>Resolve the gaps before signing the contract to protect profit margins.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Unclear scope ownership leads to serious field arguments between project managers and superintendents. Plus, owners expect one thing, but contractors read another, resulting in friction during the building process. Thus, these misunderstandings lead to legal claims and delays that stop work on site. Identifying the gaps early protects business relationships and ensures everyone agrees on the plan details.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Uncover Hidden Mistakes When You Conduct A Scope Review<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Preconstruction teams must conduct scope review sessions regularly to keep all departments informed of project changes. Gathering project managers and estimators together in a room allows them to examine the automated trade scope sheets. Checking the connections between electrical and HVAC plans is necessary, along with reviewing the plumbing and heating details. The software maps extracted notes to each trade, and this map helps teams find discipline conflicts before they reach the field.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The workflow for this review is simple enough for any team member to follow without extensive training. First, upload project documents to the platform and let the system read the files. The AI extracts trade references and notes; then the team reviews the structured output file together. Experts check the flagged items for accuracy, and finally, estimators adjust bid numbers accordingly. This process keeps the estimate highly accurate, lowering the risk of underbidding a complex project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Smaller construction teams can use this simple workflow since it does not require a complex IT setup or maintenance. It reduces manual document review efforts significantly, meaning companies do not need a massive staff to handle large bids. The automated system handles the heavy reading work, letting the team focus on solving the actual coordination issues. This workflow gives excellent preconstruction visibility, allowing small firms to compete with much larger companies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Examining a detailed case study regarding document validation clarifies these project benefits. A midsize general contractor prepared a bid for an office building, and the original architectural drawings placed the primary electrical panels in the basement. However, a late structural amendment shifted a foundation wall, and this shift blocked the access door to the panel room.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Manual reviewers missed this conflict entirely because they focused heavily on the upper floors. Fortunately, the automated scope review flagged the discrepancy instantly, catching the structural wall clash before submission. The contractor adjusted the electrical installation numbers in time, and this early detection saved thirty thousand dollars in field modifications.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Discipline coordination requires deep cross-checking across thousands of individual data points. Architectural details must match the engineering layouts perfectly; otherwise, field teams face installation issues. When drawings drift apart, field errors happen fast, driving up costs for the general contractor. The software checks for these drift issues automatically by reading trade references across the entire set, ensuring teams catch errors long before building begins.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Win More High-Value Projects When You Apply AI Scopes<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Firms should apply <a href=\"https:\/\/www.ifieldsmart.ai\/skills\/scope-of-work\/\" target=\"_blank\" rel=\"noreferrer noopener\">AI scopes<\/a> for better results when bidding on complex modern infrastructure. The iFieldSmart AI automated tool finds what humans miss by reading thousands of pages without getting tired or losing focus. The system discovers crucial coordination across all workflows, keeping generated items connected to the original drawings for easy reference. Contractors can validate every single line item quickly, and this connection ensures total transparency for the team during client presentations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Estimators can track every requirement back to the source, and this traceability makes bid validation much simpler for senior management. Teams can verify the accuracy of every number, saving estimation departments hours of tedious manual checking every single week.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">FAQs<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Question: Why do teams do scope gap reviews?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Answer: Teams reduce coordination risks before bidding starts to avoid losing profit during construction.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Question: Can estimators use this software during bids?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Answer: Yes, estimators find potential gaps before estimating to keep numbers realistic and competitive.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Question: What trades does the platform support?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Answer: It supports electrical, HVAC, plumbing, heating, and structural trades across all project types.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Question: Does the system read specification books?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Answer: Yes, it connects specification requirements to drawings for a perfect match.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Question: Is the software useful for subcontractors?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Answer: Yes, it helps them better understand trade responsibilities and bid accurately on their portion.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Question: Can smaller teams use this platform?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Answer: Yes, it greatly reduces manual document review effort, saving time for small business owners.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Question: What documents can the software analyze?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Answer: It analyzes drawings, specifications, notes, and schedules simultaneously for maximum coverage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Question: How does the software reduce confusion?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Answer: It organizes fragmented text into clearer trade views that are easy to scan and understand.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Question: Can it review large drawing sets?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Answer: Yes, it handles complex trade relationships across projects with thousands of different sheets.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Question: Does it help find missing scope coverage?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Answer: Yes, it flags incomplete or undefined responsibilities easily so teams can request clarification.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Conclusion<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A successful construction bid starts with an understanding of project requirements. A thorough estimate validation helps contractors identify hidden <a href=\"https:\/\/www.ifieldsmart.ai\/skills\/scope-gap-analysis\/\" target=\"_blank\" rel=\"noreferrer noopener\">scope gaps<\/a>, document conflicts, and potential risks before they impact project costs or timelines.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The primary <a href=\"https:\/\/www.ifieldsmart.ai\/skills\/\" target=\"_blank\" rel=\"noreferrer noopener\">AI agent<\/a> must cross-examine the final numbers against historical project data. Secondary algorithms should scan the exact boundary lines where different trade packages meet. Run a final verification loop on the automated data feeds before submission.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Fix every minor flaw before the server locks the final project price. This automated review saves your team from costly failures out on the physical job site. Secure your actual bottom line before the system uploads the files to the cloud.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Many construction projects face major cost issues early on when teams fail to catch minor errors in the initial planning documents. Contractors must thoroughly review all project files before bidding,&#8230;<\/p>\n","protected":false},"author":1,"featured_media":186,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[],"class_list":["post-185","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-preconstruction","blog-card"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Construction Bid Review Checklist | Blogs<\/title>\n<meta name=\"description\" content=\"Discover how a construction bid review and scope gap analysis can protect project profits. Learn how to prevent errors before submission.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ifieldsmart.ai\/blogs\/construction-bid-review-checklist\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Bid Review Checklist | Blogs\" \/>\n<meta property=\"og:description\" content=\"Discover how a construction bid review and scope gap analysis can protect project profits. Learn how to prevent errors before submission.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ifieldsmart.ai\/blogs\/construction-bid-review-checklist\/\" \/>\n<meta property=\"og:site_name\" content=\"iFieldSmart Ai Blog\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-10T18:17:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-10T18:17:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.ifieldsmart.ai\/blogs\/wp-content\/uploads\/2026\/08\/Blog-Banner-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"790\" \/>\n\t<meta property=\"og:image:height\" content=\"444\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.ifieldsmart.ai\/blogs\/construction-bid-review-checklist\/\",\"url\":\"https:\/\/www.ifieldsmart.ai\/blogs\/construction-bid-review-checklist\/\",\"name\":\"Construction Bid Review Checklist | Blogs\",\"isPartOf\":{\"@id\":\"https:\/\/www.ifieldsmart.ai\/blogs\/#website\"},\"datePublished\":\"2026-08-10T18:17:49+00:00\",\"dateModified\":\"2026-08-10T18:17:51+00:00\",\"author\":{\"@id\":\"https:\/\/www.ifieldsmart.ai\/blogs\/#\/schema\/person\/1b1b50ea7b2028b79fc793da114228bc\"},\"description\":\"Discover how a construction bid review and scope gap analysis can protect project profits. Learn how to prevent errors before submission.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.ifieldsmart.ai\/blogs\/construction-bid-review-checklist\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.ifieldsmart.ai\/blogs\/construction-bid-review-checklist\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.ifieldsmart.ai\/blogs\/construction-bid-review-checklist\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.ifieldsmart.ai\/blogs\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction Bid Review Checklist: What Contractors Should Validate Before Submission\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.ifieldsmart.ai\/blogs\/#website\",\"url\":\"https:\/\/www.ifieldsmart.ai\/blogs\/\",\"name\":\"iFieldSmart Ai Blog\",\"description\":\"Just another WordPress site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.ifieldsmart.ai\/blogs\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Bid Review Checklist | Blogs","description":"Discover how a construction bid review and scope gap analysis can protect project profits. Learn how to prevent errors before submission.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ifieldsmart.ai\/blogs\/construction-bid-review-checklist\/","og_locale":"en_US","og_type":"article","og_title":"Construction Bid Review Checklist | Blogs","og_description":"Discover how a construction bid review and scope gap analysis can protect project profits. Learn how to prevent errors before submission.","og_url":"https:\/\/www.ifieldsmart.ai\/blogs\/construction-bid-review-checklist\/","og_site_name":"iFieldSmart Ai Blog","article_published_time":"2026-08-10T18:17:49+00:00","article_modified_time":"2026-08-10T18:17:51+00:00","og_image":[{"width":790,"height":444,"url":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-content\/uploads\/2026\/08\/Blog-Banner-1.png","type":"image\/png"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.ifieldsmart.ai\/blogs\/construction-bid-review-checklist\/","url":"https:\/\/www.ifieldsmart.ai\/blogs\/construction-bid-review-checklist\/","name":"Construction Bid Review Checklist | Blogs","isPartOf":{"@id":"https:\/\/www.ifieldsmart.ai\/blogs\/#website"},"datePublished":"2026-08-10T18:17:49+00:00","dateModified":"2026-08-10T18:17:51+00:00","author":{"@id":"https:\/\/www.ifieldsmart.ai\/blogs\/#\/schema\/person\/1b1b50ea7b2028b79fc793da114228bc"},"description":"Discover how a construction bid review and scope gap analysis can protect project profits. Learn how to prevent errors before submission.","breadcrumb":{"@id":"https:\/\/www.ifieldsmart.ai\/blogs\/construction-bid-review-checklist\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ifieldsmart.ai\/blogs\/construction-bid-review-checklist\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.ifieldsmart.ai\/blogs\/construction-bid-review-checklist\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ifieldsmart.ai\/blogs\/"},{"@type":"ListItem","position":2,"name":"Construction Bid Review Checklist: What Contractors Should Validate Before Submission"}]},{"@type":"WebSite","@id":"https:\/\/www.ifieldsmart.ai\/blogs\/#website","url":"https:\/\/www.ifieldsmart.ai\/blogs\/","name":"iFieldSmart Ai Blog","description":"Just another WordPress site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ifieldsmart.ai\/blogs\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/posts\/185","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/comments?post=185"}],"version-history":[{"count":1,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/posts\/185\/revisions"}],"predecessor-version":[{"id":187,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/posts\/185\/revisions\/187"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/media\/186"}],"wp:attachment":[{"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/media?parent=185"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/categories?post=185"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ifieldsmart.ai\/blogs\/wp-json\/wp\/v2\/tags?post=185"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}