{"id":132,"date":"2026-08-12T14:59:13","date_gmt":"2026-08-12T14:59:13","guid":{"rendered":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/?p=132"},"modified":"2026-08-12T14:59:15","modified_gmt":"2026-08-12T14:59:15","slug":"construction-change-order-process","status":"publish","type":"post","link":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/change-management\/construction-change-order-process\/","title":{"rendered":"Construction Change Order Process: A Complete Guide for Project Teams"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><em>How seasoned contractors, owners, and designers deal with scope, cost, and schedule revisions without impacting a commercial construction project<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">After a contract is signed, every construction project evolves. Design Intent is clarified, unanticipated site conditions arise, owners request changes, and Code Officials update their requirements. These don\u2019t indicate a lack of planning. They\u2019re a natural part of building a complex commercial building. What differentiates a successful project from a failing one is not the occurrence of changes, but rather the capturing of changes through effective utilization of the change order process to maintain budget and time frame alignment with the changes. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An adjustment to the contract price, time, and\/or contract work for which approvals are required is a change order. It is the final step in a process that often begins many steps earlier, with an issue recognized in the field that requires design review before any impact to cost or time is determined. Each of these steps in the process, from identifying the issue to executing the change order, is integral to every project participant, from the superintendent in the field to the project owner\u2019s representative. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This article provides the entire construction change order process from the initiating event through the evaluation and approval steps, the forms and documents required, and how AI and software technology are virtually changing the time required to evaluate the potential changes.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Key Definitions<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong><strong>Term<\/strong><\/strong><\/th><th><strong><strong>Definition<\/strong><\/strong><\/th><\/tr><\/thead><tbody><tr><td>Change Order<\/td><td>A formal, executed document that modifies the contract sum, contract time, or scope of work.<\/td><\/tr><tr><td>Change Order Request (COR)<\/td><td>A contractor-submitted proposal, prior to formal approval, estimating the cost and time impact of a proposed change.<\/td><\/tr><tr><td>Bulletin<\/td><td>A design team-issued document describing a change to the contract documents, often the trigger for a change order.<\/td><\/tr><tr><td>Directive \/ Construction Change Directive (CCD)<\/td><td>An instruction to proceed with work before cost and time impact is finalized, used when a delay in starting work would harm the project.<\/td><\/tr><tr><td>Time and Material (T&amp;M) Change<\/td><td>A change priced based on actual labor, material, and equipment costs rather than a fixed lump sum.<\/td><\/tr><tr><td>Contingency<\/td><td>A budgeted reserve intended to absorb the cost of changes without requiring additional owner funding, up to a defined limit.<\/td><\/tr><tr><td>No-Cost Change Order<\/td><td>A change order that modifies scope or schedule without altering the contract sum.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>\u2605 KEY TAKEAWAY<\/strong><br>A change order is the contractual tool that keeps a project aligned with what everyone actually agreed to build and pay for, as the project continues to change and evolve.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Objectives of the Change Order Process<\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Properly record any change in scope, cost, or schedule to formally update the contract to match the actual work being done. <\/li>\n\n\n\n<li>Ensure the owner and contractor alike avoid disputes regarding unpriced or unapproved work. <\/li>\n\n\n\n<li>Keep the contract value and completion date correct and up to date throughout the project. <\/li>\n\n\n\n<li>Give as much as possible a clear basis for assessing the effect of cost and time before any work is done.<\/li>\n\n\n\n<li>Preserve a complete audit trail supporting final project accounting and any future claims.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Why the Change Order Process Matters<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Change orders sit at the intersection of the two things every construction stakeholder cares about most: money and time. Handled well, the process gives the owner confidence that they understand exactly what they are paying for and when they will get it, and gives the contractor a defensible basis for recovering the true cost of work beyond the original contract scope.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Handled poorly, the same process becomes a chronic source of friction. Contractors who proceed with change work before pricing is agreed on take on real financial risk if the owner later disputes the value. Owners who delay approving legitimate changes get the contractor working less on the project or building in inefficiency to avoid extra cost that won\u2019t be paid back. Both can be prevented with a routine that is up to snuff and well-known.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>\u25c6 INDUSTRY INSIGHT<\/strong><br>On most commercial projects, change orders account for a meaningful percentage of final contract value, often five to fifteen percent depending on project complexity. A process that handles that volume efficiently is not a minor administrative function it is core project financial management.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Stakeholders in the Change Order Process<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong><strong>Role<\/strong><\/strong><\/th><th><strong><strong>Responsible<\/strong><\/strong><\/th><th><strong><strong>Accountable<\/strong><\/strong><\/th><th><strong><strong>Consulted<\/strong><\/strong><\/th><th><strong><strong>Informed<\/strong><\/strong><\/th><\/tr><\/thead><tbody><tr><td>Project Manager<\/td><td>Yes<\/td><td>Yes<\/td><td>&#8211;<\/td><td>&#8211;<\/td><\/tr><tr><td>Superintendent<\/td><td>Yes (field identification)<\/td><td>&#8211;<\/td><td>Yes<\/td><td>&#8211;<\/td><\/tr><tr><td>Estimator \/ Cost Engineer<\/td><td>Yes (pricing)<\/td><td>&#8211;<\/td><td>&#8211;<\/td><td>&#8211;<\/td><\/tr><tr><td>Owner \/ Owner\u2019s Rep<\/td><td>&#8211;<\/td><td>Yes (approval)<\/td><td>Yes<\/td><td><\/td><\/tr><tr><td>Architect \/ Engineer of Record<\/td><td>&#8211;<\/td><td>&#8211;<\/td><td>Yes<\/td><td>Yes<\/td><\/tr><tr><td>Subcontractors<\/td><td>Yes (sub-tier pricing)<\/td><td>&#8211;<\/td><td>&#8211;<\/td><td>Yes<\/td><\/tr><tr><td>Accounting \/ Contract Administration<\/td><td>Yes (documentation and tracking)<\/td><td>&#8211;<\/td><td>&#8211;<\/td><td>&#8211;<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The owner or owner\u2019s representative typically holds final approval authority, but the process only works efficiently when the contractor\u2019s estimating team, the design team, and relevant subcontractors are engaged early enough to price the change accurately before it becomes urgent.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A frequent point of friction is the design team\u2019s role. Architects and engineers are often asked to weigh in on whether a proposed change is even necessary or whether an alternate, less costly approach would satisfy the same underlying need. Involving them at the evaluation stage, rather than only at final sign-off, tends to produce better outcomes than presenting a fully priced change order and asking for approval after the fact.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Measuring Change Order Process Health<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Most project teams track change order dollar volume closely but rarely measure how efficiently the process itself is running. A few indicators reveal whether the process is functioning smoothly or quietly creating friction and risk.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong><strong>Indicator<\/strong><\/strong><\/th><th><strong><strong>Healthy Signal<\/strong><\/strong><\/th><th><strong><strong>Warning Signal<\/strong><\/strong><\/th><\/tr><\/thead><tbody><tr><td>Average cycle time from COR submission to approval<\/td><td>Within the contractually defined review period<\/td><td>Consistently exceeding the defined timeline<\/td><\/tr><tr><td>Percentage of change orders priced before work begins<\/td><td>High, with directives used only for genuine urgency<\/td><td>Frequent work-first, price-later situations<\/td><\/tr><tr><td>Contingency remaining versus percentage of project complete<\/td><td>Roughly proportional, with a reasonable buffer<\/td><td>Contingency depleting faster than project progress<\/td><\/tr><tr><td>Number of disputed or renegotiated change order prices<\/td><td>Rare, isolated occurrences<\/td><td>Recurring disputes over previously priced work<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Looking at the indicators monthly together with the usual cost and schedule report gives project leadership an early warning system for change order issues, instead of only finding a contingency shortfall when it has already become a hard conversation with the owner.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>The Construction Change Order Workflow<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong><strong>Step<\/strong><\/strong><\/th><th><strong><strong>Activity<\/strong><\/strong><\/th><th><strong><strong>Primary Owner<\/strong><\/strong><\/th><th><strong><strong>Typical Output<\/strong><\/strong><\/th><\/tr><\/thead><tbody><tr><td>1<\/td><td>Identify the trigger (bulletin, RFI, field condition, owner request)<\/td><td>PM \/ Superintendent \/ Design Team<\/td><td>Documented trigger event<\/td><\/tr><tr><td>2<\/td><td>Issue or receive a change request describing the proposed change<\/td><td>PM or Owner<\/td><td>Change Request (see companion article)<\/td><\/tr><tr><td>3<\/td><td>Evaluate scope, cost, and schedule impact<\/td><td>Estimator, Superintendent, Subcontractors<\/td><td>Change Order Request (COR) with pricing<\/td><\/tr><tr><td>4<\/td><td>Submit COR for owner\/design team review<\/td><td>Project Manager<\/td><td>Submitted COR package<\/td><\/tr><tr><td>5<\/td><td>Negotiate and finalize pricing and time impact<\/td><td>PM, Owner\u2019s Rep<\/td><td>Agreed cost and time impact<\/td><\/tr><tr><td>6<\/td><td>Issue formal Change Order for signature<\/td><td>Contract Administrator<\/td><td>Executed Change Order<\/td><\/tr><tr><td>7<\/td><td>Update contract value, schedule, and budget tracking<\/td><td>PM \/ Accounting<\/td><td>Updated contract documents<\/td><\/tr><tr><td>8<\/td><td>Communicate approved change to the field and affected subcontractors<\/td><td>Superintendent<\/td><td>Field notification, updated drawings if applicable<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Step 1: Identifying the Trigger<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Identifying the origin of change orders is vital for effectively managing the process. For example, correcting a coordination conflict with a design bulletin is treated differently than a finish upgrade directed by the owner, which is also treated differently than an unexpected condition found during an excavation.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Step 2: The Change Request<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Before formal pricing begins, most projects use a change request to document the proposed change and route it for initial review. This step confirms the change are not time consuming to price, and evaluation.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Step 3: Evaluating Cost and Schedule Impact<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Pricing changes require input from all affected subcontractors and not just a general contractor estimate. Overall, this is probably the most important step, as an inadequate evaluation that misses the impact to downstream trades often results in a disputed supplemental change order.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Impact to the schedule is also important to consider and is generally estimated and evaluated on par with the cost. A small change in cost can create a critical path activity, a schedule conflict, and a time impact to other trades in the area, even if that path has a lot of float. This is why an estimator would consider both aspects of change. A cost change with no schedule consideration is likely to result in a claim for schedule delay.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Step 4-6: Submission, Negotiation, and Execution<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The COR package should contain enough information for the owner to assess the request. It should describe the scope, include line-item pricing, explain schedule impact, and be accompanied by the triggering bulletin or other relevant photos. Negotiation is the expected part of the process, and the goal of a thorough COR is to make the negotiation as effective and as friendly as possible.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Step 7- 8: Updating Records and Communicating to the Field<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Once executed, the change order must flow into every system that tracks contract value, schedule, and budget, and the field team needs clear notification of what has actually changed. A change order that gets executed at the office but never properly communicated to the superintendent creates exactly the kind of confusion the process was designed to prevent.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Change Order Pricing Methods<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong><strong>Method<\/strong><\/strong><\/th><th><strong><strong>Best Use<\/strong><\/strong><\/th><th><strong><strong>Consideration<\/strong><\/strong><\/th><\/tr><\/thead><tbody><tr><td>Lump Sum<\/td><td>Well-defined scope with clear quantities<\/td><td>Requires accurate upfront estimation to avoid disputes over completeness<\/td><\/tr><tr><td>Unit Price<\/td><td>Repetitive work with variable quantities (e.g., excavation)<\/td><td>Requires accurate unit rates established in the original contract<\/td><\/tr><tr><td>Time and Material (T&amp;M)<\/td><td>Undefined or highly uncertain scope<\/td><td>Requires disciplined daily tracking and owner oversight to control cost<\/td><\/tr><tr><td>Not-to-Exceed T&amp;M<\/td><td>Uncertain scope where the owner wants a cost ceiling<\/td><td>Balances flexibility with cost control, but requires clear ceiling definition<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>\u2713 EXPERT TIP<\/strong><br>Reserve time and material pricing for genuinely undefined scope. Defaulting to T&amp;M for changes that could reasonably be scoped as lump sum removes the cost discipline a fixed price provides and often costs the owner more in the end.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Required Documentation<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong><strong>Document<\/strong><\/strong><\/th><th><strong><strong>Purpose<\/strong><\/strong><\/th><th><strong><strong>Retention Priority<\/strong><\/strong><\/th><\/tr><\/thead><tbody><tr><td>Triggering Document (bulletin, RFI, field report)<\/td><td>Establishes the basis and cause of the change<\/td><td>High supports the change order\u2019s justification<\/td><\/tr><tr><td>Change Order Request (COR)<\/td><td>Documents the proposed scope, cost, and schedule impact<\/td><td>High the working record before execution<\/td><\/tr><tr><td>Subcontractor Pricing Backup<\/td><td>Supports the accuracy of the overall price<\/td><td>Highly critical if pricing is later disputed<\/td><\/tr><tr><td>Executed Change Order<\/td><td>The final, contractually binding record<\/td><td>High part of the permanent contract record<\/td><\/tr><tr><td>Updated Schedule<\/td><td>Reflects any approved time extension<\/td><td>Medium superseded by later schedule updates<\/td><\/tr><tr><td>Change Order Log<\/td><td>Tracks cumulative change order activity against contingency<\/td><td>High essential for budget management<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Technology Integration<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong><strong>Platform Type<\/strong><\/strong><\/th><th><strong><strong>Best Use<\/strong><\/strong><\/th><th><strong><strong>Limitation<\/strong><\/strong><\/th><\/tr><\/thead><tbody><tr><td>Project Management Software<\/td><td>Tracking CORs and change orders through approval workflow<\/td><td>Requires disciplined data entry to stay current<\/td><\/tr><tr><td>Estimating Software<\/td><td>Pricing changes with consistent unit costs and markups<\/td><td>Only as accurate as the underlying cost database<\/td><\/tr><tr><td>Accounting \/ ERP Systems<\/td><td>Updating contract value and generating owner billing<\/td><td>Needs tight integration with project management data to avoid mismatches<\/td><\/tr><tr><td>AI-Assisted Revision Intelligence<\/td><td>Automatically detecting drawing changes that trigger a change order<\/td><td>Requires clean baseline drawing sets for accurate comparison<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>AI-Assisted Opportunities<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A significant share of construction change orders trace back to a design revision a bulletin, a bundle of directive sketches, or an updated drawing set issued mid-project. The traditional challenge is not disagreement about whether a change occurred; it is the sheer manual effort required to find exactly what changed across a large, revised drawing set before anyone can even begin pricing it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is precisely the gap that AI-assisted revision intelligence closes. A platform like iFieldSmart AI\u2019s Change Management AI automatically overlays a newly issued drawing set against the previous baseline version, detects and clouds the specific areas that changed, and generates a structured change log describing what moved, what was added or removed, and which discipline is affected. Rather than a manual search for any discrepancies between old sheets and new by the project engineer within the whole IFC set, the tool provides a list of changes highlighted visually and numbered right there on the drawing, as well as textual information that can serve as a basis for pricing. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It does not eliminate the need for professional expertise when it comes to negotiating a change order and coming up with a price for it, but it considerably reduces the time-consuming procedure of finding the changes themselves. An informational bulletin affecting forty sheets, the vast majority of which don\u2019t contain any significant modifications at all, can be sorted through quickly enough to allow the estimating team to concentrate on the few sheets that really matter.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong><strong>Change Order Challenge<\/strong><\/strong><\/th><th><strong><strong>Traditional Approach<\/strong><\/strong><\/th><th><strong><strong>AI-Assisted Approach<\/strong><\/strong><\/th><\/tr><\/thead><tbody><tr><td>Finding what changed in a revised drawing set<\/td><td>Manual sheet-by-sheet overlay and comparison<\/td><td>Automatic overlay with clouded, numbered change markers<\/td><\/tr><tr><td>Documenting the basis for a change order<\/td><td>Manually written change descriptions<\/td><td>AI-generated narrative descriptions of each detected change<\/td><\/tr><tr><td>Prioritizing which sheets need estimator attention<\/td><td>Reviewing the entire revised set uniformly<\/td><td>Focusing directly on sheets flagged with detected changes<\/td><\/tr><tr><td>Maintaining a defensible record of the trigger<\/td><td>Relying on the bulletin document alone<\/td><td>Visual, clouded comparison preserved alongside the change log<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>\u2713 BEST PRACTICE<\/strong><br>Use AI-assisted revision detection as the first step in your change order intake process, immediately after a bulletin is received, so the estimating team starts pricing with a clear, visual understanding of scope rather than a blank search.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Implementation Roadmap<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong><strong>Phase<\/strong><\/strong><\/th><th><strong><strong>Timeline<\/strong><\/strong><\/th><th><strong><strong>Key Activities<\/strong><\/strong><\/th><\/tr><\/thead><tbody><tr><td>Phase 1: Establish Process<\/td><td>Preconstruction<\/td><td>Define change order workflow, approval thresholds, and documentation standards<\/td><\/tr><tr><td>Phase 2: Configure Tools<\/td><td>Mobilization<\/td><td>Set up tracking platform, contingency log, and revision comparison tools<\/td><\/tr><tr><td>Phase 3: Operate<\/td><td>Throughout construction<\/td><td>Process change orders through the defined workflow consistently<\/td><\/tr><tr><td>Phase 4: Monitor<\/td><td>Monthly<\/td><td>Review contingency usage and change order cycle time<\/td><\/tr><tr><td>Phase 5: Close Out<\/td><td>Project closeout<\/td><td>Reconcile all change orders against final contract value<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Best Practices<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong><strong>Practice<\/strong><\/strong><\/th><th><strong><strong>Why It Works<\/strong><\/strong><\/th><\/tr><\/thead><tbody><tr><td>Price changes before authorizing work whenever possible<\/td><td>Avoids disputes over value after the work is already complete<\/td><\/tr><tr><td>Use a Construction Change Directive only when delay would cause real harm<\/td><td>Preserves pricing discipline while still keeping schedule-critical work moving<\/td><\/tr><tr><td>Track contingency usage continuously, not just at monthly reporting<\/td><td>Surfaces budget risk early enough to respond<\/td><\/tr><tr><td>Require subcontractor backup for every change order price<\/td><td>Protects the accuracy and defensibility of the overall number<\/td><\/tr><tr><td>Communicate executed change orders to the field promptly and clearly<\/td><td>Prevents confusion between what was approved and what the field believes was approved<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Common Mistakes<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong><strong>Mistake<\/strong><\/strong><\/th><th><strong><strong>Consequence<\/strong><\/strong><\/th><th><strong><strong>Correction<\/strong><\/strong><\/th><\/tr><\/thead><tbody><tr><td>Proceeding with change work without any pricing agreement<\/td><td>Disputed value with no clear basis for resolution<\/td><td>Use a documented directive with a defined pricing deadline if work must proceed<\/td><\/tr><tr><td>Defaulting to time and material pricing for well-defined scope<\/td><td>Loses cost discipline and often costs more than a lump sum would<\/td><td>Reserve T&amp;M for genuinely undefined or highly uncertain scope<\/td><\/tr><tr><td>Letting the change order log fall behind actual field activity<\/td><td>Budget and schedule tracking become unreliable<\/td><td>Update the log in real time as CORs are submitted and approved<\/td><\/tr><tr><td>Missing downstream trade impacts during pricing<\/td><td>Supplemental, disputed change orders surface later<\/td><td>Require sign-off from every potentially affected subcontractor before finalizing pricing<\/td><\/tr><tr><td>Failing to update the field on approved changes<\/td><td>Crews work from outdated scope, causing rework<\/td><td>Establish a formal field notification step as part of the standard workflow<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>\u2716 COMMON MISTAKE<\/strong><br>The most expensive change order mistake is not a pricing error \u2014 it is authorizing work to proceed with no documented agreement on scope or cost, leaving the value entirely open to dispute later.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Industry Examples<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong><strong>Project Type<\/strong><\/strong><\/th><th><strong><strong>Common Change Trigger<\/strong><\/strong><\/th><th><strong><strong>Process Adaptation<\/strong><\/strong><\/th><\/tr><\/thead><tbody><tr><td>Commercial Office<\/td><td>Tenant improvement scope refinement<\/td><td>Streamlined lump-sum change process for well-defined finish changes<\/td><\/tr><tr><td>Healthcare Facility<\/td><td>Code-driven design revisions during construction<\/td><td>Expedited review process for life-safety-related changes<\/td><\/tr><tr><td>Data Center<\/td><td>Equipment specification changes<\/td><td>Detailed technical review involving specialized engineering consultants<\/td><\/tr><tr><td>Manufacturing Facility<\/td><td>Owner equipment integration changes<\/td><td>Close coordination with owner\u2019s equipment vendors on pricing and schedule<\/td><\/tr><tr><td>Residential Multifamily<\/td><td>Unit-level finish upgrades requested by ownership<\/td><td>Standardized pricing menu for common upgrade options<\/td><\/tr><tr><td>Infrastructure \/ Civil<\/td><td>Differing site conditions<\/td><td>Formal differing conditions claim process layered onto standard change order workflow<\/td><\/tr><tr><td>Institutional (K-12\/Higher Ed)<\/td><td>Phasing changes to accommodate occupied campus<\/td><td>Change orders frequently tied to schedule impact more than cost<\/td><\/tr><tr><td>Industrial \/ Process Plant<\/td><td>Process equipment coordination changes<\/td><td>Rigorous engineering review before any change order pricing begins<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">On a data center project, a single mechanical bulletin affecting cooling system routing triggered what initially looked like a minor change order. I-assisted revision detection by the estimating team showed that the bulletin had silently changed the routing of electrical conduit on three other sheets that are tricky to spot in a manual review, since the main point of the bulletin just explained the mechanical change. Finding that early avoided a supplemental change order dispute that would have come up weeks later when the electrical subcontractor found the conflict in the field.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>FAQs<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>What is the difference between a change order and a change order request?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A Change Order Request (COR) is the contractor\u2019s proposal describing the scope, cost, and time impact of a proposed change, submitted for owner and design team review. A change order is the final, formally executed document that actually modifies the contract once the COR has been reviewed and agreed upon.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong> Can a contractor be paid for work performed without an approved change order?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This depends heavily on contract language and jurisdiction, but generally, proceeding with unpriced or unauthorized work carries significant financial risk for the contractor. A Construction Change Directive is the more defensible path when work must proceed before final pricing is agreed upon, since it documents the owner\u2019s authorization to proceed even without a finalized price.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>How is contingency different from a change order budget?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Contingency is a reserve built into the overall project budget specifically to absorb the cost of anticipated changes without requiring additional owner funding, up to a defined limit. Change orders draw against contingency; once it is exhausted, further changes typically require additional owner-approved funding.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>What should be included in a change order request package?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A complete COR package includes a clear scope description, itemized pricing with subcontractor backup, schedule impact analysis, and reference to the triggering document such as a bulletin, RFI, or field condition report. Incomplete packages are the most common cause of delayed approval.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>How long should the change order approval process take?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This depends on the project and how complex the change is, but a lot of contracts set a review period of 10 to 15 business days for the owner to respond to a submitted COR. Setting and sticking to this timeline in the contract helps avoid changes from getting stuck in limbo.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Can AI tools replace the need for a formal change order process?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">No. AI-assisted tools can dramatically speed up the identification of what changed in a revised drawing set, but the contractual process of pricing, negotiating, and formally executing a change order still requires human judgment and remains a legal necessity for modifying the contract.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>What happens if the owner and contractor cannot agree on change order pricing?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Most contracts include a dispute resolution mechanism for unresolved change order pricing, ranging from mediation to arbitration or litigation depending on contract terms. Many disputes are avoided entirely by using a Construction Change Directive to keep work moving while pricing is negotiated separately.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Should every change, no matter how small, go through the full change order process?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Most projects establish a minimum dollar threshold or use simplified no-cost change orders for minor, zero-cost scope clarifications. Applying the full formal process to every trivial adjustment tends to create unnecessary administrative burden without meaningfully protecting either party.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>How does a Construction Change Directive differ from a regular change order?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A Construction Change Directive allows construction to start before the estimated cost and time impacts are settled, generally used when waiting for a full pricing agreement would be detrimental to the project. It still requires eventual conversion into a fully priced and executed change order once the cost and schedule impact are resolved, unlike a standard change order which is priced and approved before work begins.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>What is the role of markup in change order pricing?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Markup covers overhead and profit on the direct cost of the change and is typically set as a percentage defined in the original contract, often varying by whether the work is self-performed or subcontracted. Disputes over markup rates are far less common when the percentages are clearly established in the contract rather than negotiated fresh on every change order.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Expert Recommendations<\/strong><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Establish specific change order approval deadlines and threshold amounts in the contract before construction starts.<\/li>\n\n\n\n<li>Require complete subcontractor pricing backup for every change order, regardless of size, to protect defensibility.<\/li>\n\n\n\n<li>Adopt AI-assisted revision detection immediately upon receiving any bulletin or drawing revision set, to accelerate accurate scoping.<\/li>\n\n\n\n<li>Track contingency usage in real time and flag any trend toward exhaustion well before it becomes a budget crisis.<\/li>\n\n\n\n<li>Formalize the field notification step so approved changes reach the superintendent and affected trades promptly and clearly.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Conclusion<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The change order process is one of the clearest tests of how well a project team manages the inevitable gap between the contract as signed and the project as actually built. Projects that handle this process with disciplined pricing changes, accurately documenting them thoroughly, and communicating them clearly protect both the owner\u2019s budget and the contractor\u2019s margin.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As AI-assisted tools make it faster to detect exactly what changed in a design revision, the bottleneck in the change order process is shifting away from manual comparison work and toward the negotiation and decision-making that still requires human judgment. That shift is a genuine opportunity for project teams willing to build the discipline this process has always required, now with considerably less manual effort standing in the way.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>How seasoned contractors, owners, and designers deal with scope, cost, and schedule revisions without impacting a commercial construction project After a contract is signed, every construction project evolves. Design Intent is clarified, unanticipated site conditions arise, owners request changes, and Code Officials update their requirements. These don\u2019t indicate a lack of planning. They\u2019re a natural [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[],"class_list":["post-132","post","type-post","status-publish","format-standard","hentry","category-change-management"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction Change Order Process | iFieldSmart AI<\/title>\n<meta name=\"description\" content=\"Learn the construction change order process, from identifying changes to pricing, approval, documentation, and AI-assisted change management.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.ifieldsmart.ai\/knowledge-center\/change-management\/construction-change-order-process\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Change Order Process | iFieldSmart AI\" \/>\n<meta property=\"og:description\" content=\"Learn the construction change order process, from identifying changes to pricing, approval, documentation, and AI-assisted change management.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.ifieldsmart.ai\/knowledge-center\/change-management\/construction-change-order-process\/\" \/>\n<meta property=\"og:site_name\" content=\"knowledge-center\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-12T14:59:13+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-12T14:59:15+00:00\" \/>\n<meta name=\"author\" content=\"ifieldsmart.ai\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"ifieldsmart.ai\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.ifieldsmart.ai\\\/knowledge-center\\\/change-management\\\/construction-change-order-process\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ifieldsmart.ai\\\/knowledge-center\\\/change-management\\\/construction-change-order-process\\\/\"},\"author\":{\"name\":\"ifieldsmart.ai\",\"@id\":\"https:\\\/\\\/www.ifieldsmart.ai\\\/knowledge-center\\\/#\\\/schema\\\/person\\\/51f5e238c4ca5a90257a3a2a63299411\"},\"headline\":\"Construction Change Order Process: A Complete Guide for Project Teams\",\"datePublished\":\"2026-08-12T14:59:13+00:00\",\"dateModified\":\"2026-08-12T14:59:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.ifieldsmart.ai\\\/knowledge-center\\\/change-management\\\/construction-change-order-process\\\/\"},\"wordCount\":3610,\"commentCount\":0,\"articleSection\":[\"Change Management\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.ifieldsmart.ai\\\/knowledge-center\\\/change-management\\\/construction-change-order-process\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.ifieldsmart.ai\\\/knowledge-center\\\/change-management\\\/construction-change-order-process\\\/\",\"url\":\"https:\\\/\\\/www.ifieldsmart.ai\\\/knowledge-center\\\/change-management\\\/construction-change-order-process\\\/\",\"name\":\"Construction Change Order Process | iFieldSmart AI\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.ifieldsmart.ai\\\/knowledge-center\\\/#website\"},\"datePublished\":\"2026-08-12T14:59:13+00:00\",\"dateModified\":\"2026-08-12T14:59:15+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.ifieldsmart.ai\\\/knowledge-center\\\/#\\\/schema\\\/person\\\/51f5e238c4ca5a90257a3a2a63299411\"},\"description\":\"Learn the construction change order process, from identifying changes to pricing, approval, documentation, and AI-assisted change management.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.ifieldsmart.ai\\\/knowledge-center\\\/change-management\\\/construction-change-order-process\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.ifieldsmart.ai\\\/knowledge-center\\\/change-management\\\/construction-change-order-process\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.ifieldsmart.ai\\\/knowledge-center\\\/change-management\\\/construction-change-order-process\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.ifieldsmart.ai\\\/knowledge-center\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction Change Order Process: A Complete Guide for Project Teams\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.ifieldsmart.ai\\\/knowledge-center\\\/#website\",\"url\":\"https:\\\/\\\/www.ifieldsmart.ai\\\/knowledge-center\\\/\",\"name\":\"knowledge-center\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.ifieldsmart.ai\\\/knowledge-center\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.ifieldsmart.ai\\\/knowledge-center\\\/#\\\/schema\\\/person\\\/51f5e238c4ca5a90257a3a2a63299411\",\"name\":\"ifieldsmart.ai\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/90da01ed02edb6771e02823045695eb8320e44660e511fb3d1127d83b67543e8?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/90da01ed02edb6771e02823045695eb8320e44660e511fb3d1127d83b67543e8?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/90da01ed02edb6771e02823045695eb8320e44660e511fb3d1127d83b67543e8?s=96&d=mm&r=g\",\"caption\":\"ifieldsmart.ai\"},\"sameAs\":[\"https:\\\/\\\/www.ifieldsmart.ai\\\/knowledge-center\"],\"url\":\"https:\\\/\\\/www.ifieldsmart.ai\\\/knowledge-center\\\/author\\\/ifieldsmart-ai\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Change Order Process | iFieldSmart AI","description":"Learn the construction change order process, from identifying changes to pricing, approval, documentation, and AI-assisted change management.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/change-management\/construction-change-order-process\/","og_locale":"en_US","og_type":"article","og_title":"Construction Change Order Process | iFieldSmart AI","og_description":"Learn the construction change order process, from identifying changes to pricing, approval, documentation, and AI-assisted change management.","og_url":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/change-management\/construction-change-order-process\/","og_site_name":"knowledge-center","article_published_time":"2026-08-12T14:59:13+00:00","article_modified_time":"2026-08-12T14:59:15+00:00","author":"ifieldsmart.ai","twitter_card":"summary_large_image","twitter_misc":{"Written by":"ifieldsmart.ai","Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/change-management\/construction-change-order-process\/#article","isPartOf":{"@id":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/change-management\/construction-change-order-process\/"},"author":{"name":"ifieldsmart.ai","@id":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/#\/schema\/person\/51f5e238c4ca5a90257a3a2a63299411"},"headline":"Construction Change Order Process: A Complete Guide for Project Teams","datePublished":"2026-08-12T14:59:13+00:00","dateModified":"2026-08-12T14:59:15+00:00","mainEntityOfPage":{"@id":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/change-management\/construction-change-order-process\/"},"wordCount":3610,"commentCount":0,"articleSection":["Change Management"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.ifieldsmart.ai\/knowledge-center\/change-management\/construction-change-order-process\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/change-management\/construction-change-order-process\/","url":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/change-management\/construction-change-order-process\/","name":"Construction Change Order Process | iFieldSmart AI","isPartOf":{"@id":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/#website"},"datePublished":"2026-08-12T14:59:13+00:00","dateModified":"2026-08-12T14:59:15+00:00","author":{"@id":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/#\/schema\/person\/51f5e238c4ca5a90257a3a2a63299411"},"description":"Learn the construction change order process, from identifying changes to pricing, approval, documentation, and AI-assisted change management.","breadcrumb":{"@id":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/change-management\/construction-change-order-process\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.ifieldsmart.ai\/knowledge-center\/change-management\/construction-change-order-process\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/change-management\/construction-change-order-process\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/"},{"@type":"ListItem","position":2,"name":"Construction Change Order Process: A Complete Guide for Project Teams"}]},{"@type":"WebSite","@id":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/#website","url":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/","name":"knowledge-center","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/#\/schema\/person\/51f5e238c4ca5a90257a3a2a63299411","name":"ifieldsmart.ai","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/90da01ed02edb6771e02823045695eb8320e44660e511fb3d1127d83b67543e8?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/90da01ed02edb6771e02823045695eb8320e44660e511fb3d1127d83b67543e8?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/90da01ed02edb6771e02823045695eb8320e44660e511fb3d1127d83b67543e8?s=96&d=mm&r=g","caption":"ifieldsmart.ai"},"sameAs":["https:\/\/www.ifieldsmart.ai\/knowledge-center"],"url":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/author\/ifieldsmart-ai\/"}]}},"_links":{"self":[{"href":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/wp-json\/wp\/v2\/posts\/132","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/wp-json\/wp\/v2\/comments?post=132"}],"version-history":[{"count":1,"href":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/wp-json\/wp\/v2\/posts\/132\/revisions"}],"predecessor-version":[{"id":133,"href":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/wp-json\/wp\/v2\/posts\/132\/revisions\/133"}],"wp:attachment":[{"href":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/wp-json\/wp\/v2\/media?parent=132"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/wp-json\/wp\/v2\/categories?post=132"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ifieldsmart.ai\/knowledge-center\/wp-json\/wp\/v2\/tags?post=132"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}