AI-POWERED SUBMITTAL COMPLIANCE REVIEW

Reviewing Submittals Shouldn't Take Hours.

Check every submittal against specs, drawings, and standards — in minutes.

HOW IT WORKS

Upload the submittal

Select your submittal file from your computer

Click AI review

AI analyzes against all requirements

Get compliance report

Download detailed results instantly

Click to play/pause

iFieldSmart AI - Submittal Compliance Review
READY

Submittal Compliance Checker

Review submittals against specifications
ID
SPEC SECTION
TITLE
STATUS
ISSUE DATE
DUE DATE
ASSIGN
AI

No submittals yet

Upload a submittal to start compliance review

Open
Documents / Projects / Submittals
Plumbing_Submittal_PVC.pdf 3.2 MB • Modified today
HVAC_Equipment_Specs.pdf 5.8 MB • Modified yesterday
Electrical_Panel_Data.pdf 2.1 MB • Modified 2 days ago
Plumbing_Submittal_PVC.pdf 3.2 MB
Uploading... 0%

AI Processing

Analyzing submittal against requirements...

Specifications Standards Compliance

Compliance Report

5 Items
REQUIREMENT
SUBMITTAL RESPONSE
STATUS
OVERALL COMPLIANCE
60%
OVERALL STATUS
Resubmit Required
CURRENT REALITY

You've done this before.

📁 Project Files Submittals
Plumbing_Submittal_PVC.pdf
3.2 MB • Modified today
Opening...
📄

Project_Specifications.pdf

Division 22 - Plumbing • Page 47 of 324
SECTION 22 11 00
FACILITY WATER DISTRIBUTION PIPING
PART 1 - GENERAL
1.1
SUMMARY
A. Section Includes: Pipes, tubes, and fittings for water distribution systems.
1.2
SUBMITTALS
A. Product Data: For each type of pipe, tube, fitting, and valve.
B. Shop Drawings: Detail fabrication and installation of piping systems.
PART 2 - PRODUCTS
2.1
PIPING MATERIALS
A. PVC Pipe: ASTM D1785, Schedule 40, with solvent-cement joints.
B. Comply with ASTM D1785 for PVC plastic pipe, Schedule 40 type.
C. Solvent cement per ASTM D2564 for joining PVC pipe and fittings.
2.2
FITTINGS
A. PVC Fittings: ASTM D2466, socket-type, Schedule 40.
📐

M-201 - HVAC Mechanical Plan

Sheet 5 of 18 • Scale 1/8" = 1'-0"
SPD C.2 - Supply Diffuser
EHC-1 - Exhaust Hood
1
16x12 DUCT
Verified
2
VRF-AC-C05
Checking...
Manually reviewing...
📄

Submittal Document

Plumbing_Submittal_PVC.pdf

Pipe Material
PVC Schedule 40, ASTM D1785 compliant
Pressure Rating
450 PSI @ 73°F
Solvent Cement
ASTM D2564 Type II Medium Bodied
Joint Assembly
Per manufacturer guidelines
ASTM D1785
ASTM D2564
SMACNA

ASTM D1785

Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120

Schedule 40 classification verified
Pressure rating verification in progress
?
Material composition requirements
?
Dimensional tolerances check
Cross-referencing standards...

Does this actually comply?

?
Specification requirements
?
Drawing details
?
Industry standards
?
Regional codes
01

Open the submittal

Locate and access the submittal document

02

Go through specifications

Compare submittal against project specs

03

Check drawings

Verify details match construction documents

04

Cross-reference standards

Check compliance with industry codes

05

"Does this actually comply?"

Manual review is time-consuming and error-prone

WHY IT BREAKS

The problem isn't reviewing — it's verifying everything.

Submittals need to be checked against:

  • Specification requirements
  • Drawing details
  • Industry standards
  • Regional codes

All across multiple documents.

⚠️ What happens in reality:

  • Some checks get skipped
  • Some details get overlooked
  • Some assumptions get made

And those gaps don't show up immediately.

Specs
Drawings
Standards
Codes
Material specifications verified
Installation requirements checked
Drawing detail cross-reference Gap
Code compliance reviewed
Industry standard verification Gap
?
Regional requirements Gap
3 gaps detected
THE SOLUTION

Now review it in one step.

With iFieldSmart AI, you can review any submittal against all required references — instantly.

Attach subcontractor submittal

PDF, package, or product data sheet
HVAC_Submittal_Package.pdf 8.2 MB
Submitted by subcontractor Ready to review
Attach the subcontractor's submittal
Specs
Drawings
Standards
Codes
Click “AI Review”
Compliance Report Ready
95% compliant

Standards verified

Partial documentation

Missing product data

Compliance report ready
Get a clear compliance result
WHAT HAPPENS

Everything is checked against what’s required.

The system compares your submittal against every reference that matters before a reviewer makes the call.

Specifications

Required materials, product data, installation rules, and section notes.

Contract drawings

Plan details, schedules, callouts, dimensions, and drawing-specific requirements.

Industry standards

ASTM, SMACNA, manufacturer requirements, and trade-specific standards.

Regional codes

Local compliance criteria that can affect approval, rejection, or resubmission.

Submittal AI Review

Cross-checking all required references

Specifications
Drawings
Standards
Regional codes
Requirement check Live

Pipe schedule matches spec

Drawing detail needs review

ASTM reference verified

OUTPUT

Get a compliance report
you can actually use.

Every requirement becomes a clear decision with source context, missing items, and next action.

Main Compliance Report

What is required, what is submitted, status, and what needs correction.

Standards Comparison

ASTM, SMACNA, and other relevant codes checked side by side.

Summary

Overall compliance percentage, review status, key deficiencies, and gaps.

Structured Traceable Actionable
AI Compliance Report

HVAC Submittal Review

Resubmit Required
95%

Overall compliance

12 Requirements checked
3 Key deficiencies
Main Report Standards Summary
Required Submitted Status Correction
ASTM D1785 pipe data
Schedule 40 listed
Partial
Add pressure rating sheet
Manufacturer install instructions
Not provided
Missing
Submit installation manual
SMACNA duct seal standard
Referenced in package
Compliant
No correction needed
ASTM verified
SMACNA partial
Code source linked
Project Hilton Tower LIVE
Export
ID
SPEC SECTION
TITLE
STATUS
DUE DATE
103
03 15 00
Structural Concrete Foundation
Approved
09/15/2024
102
09 68 00
Carpeting and Flooring Systems
Approved
09/15/2024
101
23 81 00
Decentralized HVAC Equipment
09/15/2024
100
26 24 00
Switchboards and Panelboards
09/15/2024
99
Page 03 GVCP
Auto Integration building of submittals
09/15/2024
98
New Submittal Integration Test
New Submittal Integration Test
09/15/2024
97
New Submittal Test
New Submittal Test
09/15/2024
96
Test 5
Test 5
In Review
09/05/2024
Structured Review

Compliance Decision Breakdown

Ready
Manual comment

Need to check product data, installation docs, and standard references before approval.

AI breakdown Clear decisions
!

Missing product data

Required pipe pressure rating sheet was not included.

Not compliant
~

Partial documentation

Schedule 40 listed, but supporting test data is incomplete.

Partial compliance

Verified standards

SMACNA and ASTM references match the submitted package.

Compliant
REAL OUTPUT

This is how your review becomes structured.

Instead of writing comments manually, you get a complete breakdown that turns every issue into a clear decision.

Missing product data Not compliant
Partial documentation Partial compliance
Verified standards Compliant
Clear decisions. Faster reviews.
WORKFLOW SHIFT

From manual review
to assisted verification

Less effort. More clarity. Better decisions.

BEFORE
Read → compare → interpret → write comments

1. Read

Go through specs and submittal documents manually

2. Compare

Check line-by-line against drawings and standards

3. Interpret

Determine if requirements are actually met

4. Write comments

Manually document findings and required corrections

VS
NOW
Upload → review → act

1. Upload

Attach submittal and let AI handle the data

2. Review

Get a structured breakdown of compliance instantly

3. Act

Make clear decisions based on verifiable data

WHY IT MATTERS

Submittal review is where
risks start — or — stop.

Every missed detail is a future problem. Every verified submission is a risk removed.

MISSED DETAILS LEAD TO
The Cost of Getting It Wrong
Rework Work gets redone because specs weren't verified upfront
HIGH COST
Delays Project timelines slip when submittals bounce back and forth
SCHEDULE
Change Orders Costly scope changes triggered by overlooked non-compliance
BUDGET
Compliance Issues Regulatory exposure when standards aren't properly checked
LIABILITY
THIS HELPS YOU
What Good Review Delivers
01
Catch issues early Identify non-compliance before it reaches the field
02
Standardize review quality Every submittal gets the same thorough treatment
03
Reduce manual effort AI handles the cross-referencing — you make the call
04
Improve decision confidence Clear, traceable data behind every approval
If it's required, it should be verified. Every unreviewed submittal is an unmanaged risk.
Review with confidence
FITS INTO YOUR EXISTING WORKFLOW

Works with how you already manage submittals.

Submittal Log Your System
001 HVAC Equipment
002 Plumbing Fixtures
003 Fire Protection

Connects with your submittal log

Integrates directly with your existing tracking system

Procore Connected
Sync enabled
Auto-pull active

Pulls submittals directly

Procore integration for seamless data flow

Your Workflow Unchanged
Same process
Same tools
Better results

No process change required

Works behind the scenes with your current workflow

FAQ

Frequently Asked Questions

Find answers to common questions about submittal compliance reviews, technical standards, project workflows, integrations, and project risk mitigation.

Swipe horizontally to view all categories
Answer: It is the automated process of checking a subcontractor's submitted documents against project specs, drawings, and standards. Upload the submittal, click review, and get a detailed compliance report. No manual cross-referencing required.
Answer: A compliance review confirms if a submitted product data or shop drawings meet every requirement in the contract documents before any work starts. If they do not, the submittal goes back. Getting this right early saves a lot of pain later.
Answer: The system reviews the full package, including shop drawings, product data, manufacturer information, and installation documents, across all major construction disciplines.
Answer: In a manual review, the project engineer opens the spec binder, reads through requirements, checks drawings, verifies standards, and writes comments. That takes two to four hours per submittal. iFieldSmart AI can do it in minutes and produce the structured output.
Answer: Open the submittal log, attach the subcontractor's document, and click AI Review. The system reads all reference documents, checks every requirement, and returns a compliance report.
Answer: The AI compliance review skill helps with project specifications, contract drawings, industry standards like ASTM and SMACNA, and regional building codes, all four at the same time, not one after another.
Answer: The project requirements highlight what is compliant, partially compliant, and needs attention. It also includes a standards summary, overall compliance percentage, and key gaps.
Answer: Compliant means the requirement is fully met. Partial Compliance means something is missing, like a pressure rating sheet. Not in Compliance means the submittal needs to be corrected before it can move forward.
Answer: The review process is designed to take minutes rather than hours. Actual review time depends on the volume of documents and the number of requirements being evaluated.
Answer: The system identifies and evaluates all standards referenced in the contract documents, like ASTM, SMACNA, or other industry requirements, helping reviewers verify that submitted materials and documentation align with the required industry standards.
Answer: The AI marks it as Partial Compliance and tells you exactly what is missing. If the pressure rating sheet is absent or dimensional tolerances are not confirmed, the report says so. The subcontractor knows precisely what to fix.
Answer: Yes. Regional codes get checked alongside specs, drawings, and standards. Any gaps show up as their own category in the report, so nothing gets buried.
Answer: The system identifies all applicable sections automatically and checks each one. A mechanical package spanning Divisions 22, 23, and 26 receives a consolidated report in which every section is clearly referenced.
Answer: It is designed for general contractors, specifically project engineers, project managers, and QA/QC teams. They manage the submittal process and carry the most risk when something gets missed.
Answer: During pre-construction and early construction, before materials are ordered. Finding a compliance gap on paper is free. Finding it after installation is expensive.
Answer: Project engineers save hours on every submittal. Project managers see fewer revision cycles and faster movement. QA/QC teams get consistent review quality across all submittals.
Answer: Yes. It pulls submittals directly from your Procore log. No separate upload, no duplicate data entry. Your existing workflow stays exactly as it is.
Answer: No. The AI fits into the process you already follow. You keep your submittal log and your review steps. It just handles the cross-referencing work for you.
Answer: Non-compliant materials get installed. Rework follows. The schedule slips. Change orders pile up. And if a code requirement is missed, teams have a liability problem. Most of it traces back to something that looked fine on paper but was never properly checked.
Answer: A compliance gap caught during submittal review can be fixed in pre-construction, preventing rework costs. The subcontractor updates the document and resubmits. The same gap found after installation means demolition, replacement, and delay.
Answer: No. The AI does the checking and produces the report. The qualified reviewer, a project engineer or project manager, makes the final call. That accountability stays with the person, not the system.
Answer: Review quality often varies from one reviewer to another. The system helps to create a consistent process by checking every submittal against the same requirements, standards, and project documents.

Can't find the answer you're looking for?

Our team is here to help you get the most out of iFieldSmart AI.

Contact Support
READY TO START

If it's required, it should be verified.

Review your submittals with clarity — before they become a problem.

Early access is limited. Join now to be first in line.